ANALISIS KERUSAKAN PERKERASAN LENTUR PADA RUAS JALAN TOWUA DI KOTA PALU

AFRINALDY ANDARA (2020) ANALISIS KERUSAKAN PERKERASAN LENTUR PADA RUAS JALAN TOWUA DI KOTA PALU. Sarjana thesis, Universitas Tadulako.

Full text not available from this repository.

Abstract

Towua roads</span></em><em xss=removed><span xss=removed> there are some and the stock as exfoliation layers the surface of , the release of grains , split open and crac</span></em><em xss=removed><span lang="EN-ID" xss=removed>k. </span></em><em xss=removed><span xss=removed>So as to cause a lack of security and comfort for road users.</span></em> <em xss=removed><span xss=removed>The purpose of the study to identify a kind of , the level of , and the percentage of road damage priority value on roads towua and the factors causing the damage occurs and apply the method or the treatment of defects that occurred on </span></em><em xss=removed><span lang="EN-ID" xss=removed>Towua roads.</span></em></p>
<pre xss=removed><em xss=removed><span lang="EN-ID" xss=removed>The methods used in analyze the research by using the Bina Marga methods and testing in the laboratory to examine 3 bricket<span xss=removed>Â </span>sample taken at 3 location points, in their respective STA : KM 00 + 300, STA : KM 00 + 500 , and STA : KM 00 + 800 .</span></em></pre>
<pre xss=removed><em xss=removed><span xss=removed><span xss=removed>Â Â Â Â Â Â Â Â Â Â Â </span>Based on th</span></em><em xss=removed><span lang="EN-ID" xss=removed>e result of </span></em><em xss=removed><span xss=removed><span xss=removed>Â </span>damage</span></em><em xss=removed><span lang="EN-ID" xss=removed> analysis on</span></em><em xss=removed><span xss=removed> Towua Road, the percentage of total damage was 42,349% or 7020,617 M?2; from the total area of Towua Road with priority value (UP) = 1 where the condition of the road was severely damaged, so there was a need to increase the road by being re-coated (layer added overlay). While the test results in the laboratory obtained asphalt content for point 1 (6.5%), point 2 (8.23%) and point 3 (6.13%), as well as the results of the examination of gradation on the surface layer does not meet the specifications used.</span></em><em xss=removed><span xss=removed> <span lang="EN-ID">At some location points, for example in STA: KM 00 + 300 - 00 + 600 has a very poor drainage system with a traffic load that exceeds Towua Road capacity of 22,179.8 SMP / Day / 2 directions, so it is not possible to cause damage to the Towua Road section.</span></span></em></pre>
<pre xss=removed><em xss=removed><span lang="EN-ID" xss=removed>Â </span></em></pre>
<p class="MsoNormal" xss=removed align="center"><strong xss=removed><em xss=removed><span lang="EN" xss=removed>Keywords</span></em></strong> <strong xss=removed><em xss=removed><span lang="EN" xss=removed>:</span></em></strong> <strong xss=removed><em xss=removed><span xss=removed>Road damages<span xss=removed>, Laboratory Test, asphalt<span xss=removed>Â </span>content, </span></span></em></strong><strong xss=removed><em xss=removed><span lang="EN-ID" xss=removed>Bina Marga</span></em></strong></p>

Item Type: Thesis (Sarjana)
Commentary on: Eprints 0 not found.
Divisions: Fakultas Teknik > Teknik Sipil
SWORD Depositor: Users 0 not found.
Depositing User: Users 0 not found.
Date Deposited: 22 Jan 2025 07:16
Last Modified: 06 Feb 2025 07:14
URI: https://repository.untad.ac.id/id/eprint/102907
Baca Full Text: Baca Sekarang