IDENTIFIKASI BAHAYA DAN PENILAIAN SERTA PENGENDALIAN RISIKO KECELAKAAN KERJA KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT

GABRIELLA DESIYANTI (2023) IDENTIFIKASI BAHAYA DAN PENILAIAN SERTA PENGENDALIAN RISIKO KECELAKAAN KERJA KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT. Sarjana thesis, Universitas Tadulako.

Full text not available from this repository.

Abstract

IDENTIFIKASI BAHAYA DAN PENILAIAN SERTA PENGENDALIAN RISIKO
KECELAKAAN KERJA KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT
Gabriella Desiyanti1
, Adnan Fadjar2
, Tutang Muhtar Kamaludin3
ABSTRAK
Di Kota Palu banyak Pembangunan konstruksi gedung bertingkat yang sedang berlangsung. Adanya
kecelakaan kerja yang terjadi pada proyek konstruksi akan menjadi salah satu penyebab terganggunya
atau terhentinya aktivitas pekerjaan suatu proyek. Dengan penerapan Sistem Manajemen Keselamatan
Konstruksi (SMKK) merupakan bagian dari sistem manajemen pelaksanaan pekerjaan konstruksi
dalam rangka menjamin terwujudnya keselamatan konstruksi. Tujuan dari penelitian ini adalah untuk
mengetahui identifikasi bahaya, penilaian dan pengendalian risiko keselamatan kerja konstruksi pada
bangunan gedung. Metode yang digunakan dalam penentuan identifikasi bahaya, penilaian risko dan
pengendalian risiko keselamatan kerja konstruksi adalah metode identifikasi bahaya, penilaian risiko
dan peluang (IBPRP) yang mengacu pada Permen PUPR No. 10 Tahun 2021. Berdasarkan hasil
penelitian yang dilakukan identifikasi bahaya pada Proyek Rehabilitas dan Rekonstruksi Sarana
Pendidikan Universitas Tadulako Fase II (Gedung Rektorat Universitas Tadulako) meliputi 6 kegiatan
pekerjaan dengan 64 potensi bahaya keselamatan kerja konstruksi teridentifikasi, dengan tingkat risiko
berdasarkan analisis tabel penilaian risiko, yaitu : 13 potensi bahaya dengan tingkat risiko rendah
(20%) dan 51 potensi bahaya dengan tingkat risiko sedang (80%). Pada Proyek Pembangunan kantor
Pengadilan Tinggi Sulawesi Tengah Pasca Bencana, meliputi 6 kegiatan pekerjaan dengan 64 potensi
bahaya keselamatan kerja konstruksi teridentifikasi, dengan tingkat risiko berdasarkan analisis tabel
penilaian risiko, yaitu : 1 potensi bahaya dengan tingkat risiko rendah (2%), 9 potensi bahaya dengan
tingkat risiko tinggi (14%) dan 54 potensi bahaya dengan tingkat risiko sedang (84%). Pengendalian
risiko yang dilakukan berdasarkan hirarki pengendalian risiko adalah pengendalian teknis,
pengendalian administratif dan penggunaan alat pelindung diri (APD).
Kata Kunci : SMKK, Identifikasi Bahaya, Penilaian, Pengendalian Risiko, Metode IBPRP

IDENTIFICATION OF HAZARDS RISK ASSESSMENT AND CONTROL OF WORKPLACE
ACCIDENT IN CONSTRUCTION PROJECTS FOR MULTISTORY BUILDING
Gabriella Desiyanti1
, Adnan Fadjar2
, Tutang Muhtar Kamaludin
3
ABSTRACT
In the city of Palu, many multi-storey building constructions are underway. Work accidents that occur
on construction projects will be one of the causes of disruption or cessation of work activities on a
project. The implementation of the Construction Safety Management System (SMKK) is part of the
construction work implementation management system in order to ensure the realization of
construction safety. The aim of this research is to identify hazards, assess and control safety risks in
construction work in buildings. The method used in determining hazard identification, risk assessment
and risk control for construction work safety is the hazard identification, risk and opportunity
assessment (IBPRP) method which refers to Minister of PUPR Regulation No. 10 of 2021. Based on
the results of research carried out on identification of hazards in the Tadulako University Educational
Facilities Rehabilitation and Reconstruction Project Phase II (Tadulako University Rectorate
Building) covering 6 work activities with 64 potential construction work safety hazards identified,
with risk levels based on risk assessment table analysis, namely: 13 potential hazards with a low risk
level (20%) and 51 potential hazards with a moderate risk level (80%). In the post-disaster Central
Sulawesi High Court office construction project, it includes 6 work activities with 64 potential
construction work safety hazards identified, with risk levels based on risk assessment table analysis,
namely: 1 potential hazard with a low risk level (2%), 9 potential hazards with a high risk level (14%)
and 54 potential hazards with a moderate risk level (84%). Risk control carried out based on the risk
control hierarchy is technical control, administrative control and use of personal protective
equipment (PPE).
Keywords: SMKK, Hazard Identification, Assessment, Risk Control, IBPRP Method

Item Type: Thesis (Sarjana)
Commentary on: Eprints 0 not found.
Divisions: Fakultas Teknik > Teknik Sipil
SWORD Depositor: Users 0 not found.
Depositing User: Users 0 not found.
Date Deposited: 22 Jan 2025 07:16
Last Modified: 06 Feb 2025 07:14
URI: https://repository.untad.ac.id/id/eprint/112739
Baca Full Text: Baca Sekarang

Actions (login required)

View Item
View Item