OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN IRIGASI DESA JONO OGE KABUPATEN SIGI MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

GABRELA (2024) OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN IRIGASI DESA JONO OGE KABUPATEN SIGI MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT). Sarjana thesis, Universitas Tadulako.

Full text not available from this repository.
Item Type: Thesis (Sarjana)
Commentary on: Eprints 0 not found.
Divisions: Fakultas Matematika dan IPA > Matematika
SWORD Depositor: Users 0 not found.
Depositing User: Users 0 not found.
Date Deposited: 22 Jan 2025 07:16
Last Modified: 06 Feb 2025 07:14
URI: https://repository.untad.ac.id/id/eprint/120897
Baca Full Text: Baca Sekarang

Actions (login required)

View Item
View Item