TINJAUAN PELAKSANAAN PEKERJAAN LAPIS ASPHALT CONCRETE
– WEARING COURSE (AC – WC) PADA PROYEK PENINGKATAN RUAS
JALAN SAUSU – TUMORA
Didik Iksan Affandi, Syamsul Arifin
ABSTRAK
Jalan adalah prasarana transportasi darat yang meliputi segala bagian jalan,
termasuk bangunan pelengkap dan perlengkapannya yang diperuntukan bagi lalu
lintas, yang berada pada permukaan tanah, di atas permukaan tanah di bawah
permukaan tanah atau air, serta di atas permukaan air, kecuali jalan kereta api.
Tujuannya adalah untuk membandingkan antara metode pelaksanaan lapis
Asphalt Concrete – Wearing Course (AC-WC) dengan teori yang relevan dan
spesifikasi yang berlaku. Manfaat dari Tugas Akhir ini adalah untuk memberikan
gambaran tentang metode pelaksanaan Lapis Asphalt Concrete – Wearing Course
(AC-WC) pada proyek preservasi jalan ruas sausu - tumora serta memahami tahapan-
tahapan pekerjaan.
Berdasarkan metode yang dilaksanakan di lapangan bahwa saat ini, suatu
kegiatan untuk mencari kesesuaian antara rancangan asli yang ditunjukkan dalam
gambar rencana kerja dengan kebutuhan aktual lapangan. Kegiatan ini terdiri dari
tinjauan langsung ke lapangan dan data lapangan.
Dari hasil tinjauan yang didapat bahwa saat ini, dalam pelaksanaan pekerjaan
Lapis Asphalt Concrete-Wearing Course (AC-WC) ruas sausu - tumora pekerjaan
tersebut secara garis besar telah dilakukan sesuai gambar kerja dan persyaratan yang
telah disyaratkan dan Pengendalian mutu yang dilakukan di lapangan sudah sesuai
dengan spesifikasi.
Kata kunci : Lapis Permukaan, AC-WC, Spesifikasi Teknis

REVIEW OF THE IMPLEMENTATION OF ASPHALT CONCRETE -
WEARING COURSE (AC - WC) WORK ON THE SAUSU - TUMORA ROAD
IMPROVEMENT PROJECT
Didik Iksan Affandi, Syamsul Arifin
ABSTRACT
The road is infrastructure transportation covering land all part road, incl
building accessories and equipment intended for Then cross, which is on the
surface ground, above surface the ground below surface land or water, as well as
above water surface, except road train fire .
The goal is For compare between method Implementation of Asphalt
Concrete Layer – Wearing Course (AC-WC) with relevant theory and applicable
specifications. Benefit from This final assignment is For give description about
method implementation of the Asphalt Concrete Layer – Wearing Course (AC-WC)
on the project preservation road segment Sausu - Tumora as well as understand
stages job .
Based on methods implemented in the field that moment this , a activity For
look for suitability between design original shown _ in picture plan Work with need
actual field . This activity consists of direct field observations and field data.
From the results of the review, it was found that currently, in the
implementation of the Asphalt Concrete-Wearing Course (AC-WC) work on the
Sausu - Tumora section, the work has generally been carried out in accordance
with the work drawings and requirements that have been required and quality
control has been carried out in the field. according to specifications.
Keywords: Surface Coating, AC-WC , Technical Specifications

Item Type: Thesis (Diploma)
Commentary on: Eprints 0 not found.
Divisions: Fakultas Teknik > D3 Teknik Sipil
SWORD Depositor: Users 0 not found.
Depositing User: Users 0 not found.
Date Deposited: 22 Jan 2025 07:16
Last Modified: 06 Feb 2025 07:14
URI: https://repository.untad.ac.id/id/eprint/141212
Baca Full Text: Baca Sekarang

Actions (login required)

View Item
View Item